The framing crew arrived today and started laying down the first floor directly on the ICF blocks and the concrete. The truss system will be secured into the walls during the next concrete pour. The concrete will pour around each truss, casting it into place within the wall.
More images from our January 29th site inspection have been posted to the gallery.